Southwest Crescent Pie - KPLC 7 News, Lake Charles, Louisiana

Southwest Crescent Pie

  • 1 lb. ground beef
  • 1 can (15-16 oz.) chili beans in chili sauce
  • 1 can (14 1/2 to 15 oz. chili-seasoned stewed tomatoes, undrained
  • 1/2 cup frozen or drained canned Mexican-style corn
  • 1 package (8 oz) refrigerated crescent dinner rolls
  • 1/2 cup shredded Cheddar-Jack cheese with jalepeno peppers

 

Heat oven to 375 degrees.  Heat large nonstick skillet over medium heat until hot.  Add ground beef; cook 8 to 10 minutes, breaking into 3/4 inch crumbles and stirring occasionally.  Pour off drippings.

Stir in beans, tomatoes and corn; bring to a boil.  Cook about 10 minutes or until most of the liquid has evaporated, stirring occasionally.

Meanwhile separate crescent roll dough into into 8 triangles.  Line 9-inch pie plate with dough triangle, placing narrow tips toward center.  Firmly press edges of dough together to form crust.  Bake in 375 degree oven 10 minutes.  Remove from oven.

Spoon beef mixture into crust.  Sprinkle with cheese.  Bake 8 to 10 minutes or until edges of crust are golden brown and cheese is melted.

 

Makes 4 servings;  prepared by Cookie Hauser of the La. Beef Industry Council.

  • More Local NewsNewsMore>>

  • North Lake Charles Board wants to talk with mayoral candidates

    North Lake Charles Board wants to talk with mayoral candidates

    Tuesday, March 28 2017 12:07 AM EDT2017-03-28 04:07:42 GMT
    (Source: KPLC)(Source: KPLC)

    There's lots of talk these days about developing North Lake Charles. 

    More >>

    There's lots of talk these days about developing North Lake Charles. 

    More >>
  • Magnolia LNG at Port of Lake Charles closer to being a reality

    Magnolia LNG at Port of Lake Charles closer to being a reality

    Monday, March 27 2017 11:57 PM EDT2017-03-28 03:57:32 GMT
    (Source: Magnolia LNG)(Source: Magnolia LNG)

    A liquified natural gas export terminal to be built at the Port of Lake Charles is a step closer to reality. At Monday's port meeting, the board of directors approved the signing of  a 30-year ground lease with Magnolia LNG. Board members said it's a positive sign that Magnolia LNG is willing to take the next step - from lease option to actual lease. Construction on the Magnolia facility is expected to begin later this year, bringing 100 construction jobs and 70 permanent jobs ...

    More >>

    A liquified natural gas export terminal to be built at the Port of Lake Charles is a step closer to reality. At Monday's port meeting, the board of directors approved the signing of  a 30-year ground lease with Magnolia LNG. Board members said it's a positive sign that Magnolia LNG is willing to take the next step - from lease option to actual lease. Construction on the Magnolia facility is expected to begin later this year, bringing 100 construction jobs and 70 permanent jobs ...

    More >>
  • Youth Summit and Job Fair set for March 28

    Youth Summit and Job Fair set for March 28

    Monday, March 27 2017 9:54 PM EDT2017-03-28 01:54:08 GMT
    (Source: KPLC)(Source: KPLC)

    The Calcasieu Workforce Center (CWC) will host its annual Youth Summit/Job Fair from 8 a.m. until 1 p.m., Tuesday, March 28, on the second and third floors of the Lake Charles Civic Center, 900 Lakeshore Dr. 

    More >>

    The Calcasieu Workforce Center (CWC) will host its annual Youth Summit/Job Fair from 8 a.m. until 1 p.m., Tuesday, March 28, on the second and third floors of the Lake Charles Civic Center, 900 Lakeshore Dr. 

    More >>
Powered by Frankly